top of page
Modern Architecture

ARCHITECTURE PROPOSALS

The Brick House @ Bukit Setiawangsa, Kuala Lumpur

Client  : Individual Owner

Type of Project  : Residential Terrace

Location  : Bukit Setiawangsa, K.Lumpur

Project Cost (RM)  : 250k

Completion Date  : 2022

Building(s)  : Residential

Scope of Works  :

• Designing schematic design

• Preparing detail drawings & costing

• Getting approvals from local authority

1 (3).jpg

Retro Brick House @ Jalan Redan, Sijangkang, Selangor

2 (1).jpg

Client  : Individual Owner

Type of Project  : Single Storey Bungalow

Location  : Sijangkang, Selangor

Project Cost (RM)  : 250k

Completion Date  : 2022

Building(s)  : Residential

 

Scope of Works  :

• Designing schematic design

• Preparing detail drawings & costing

• Getting approvals from local authority

 

Floating Musolla @ Semenyih, Selangor

Scope of Works :
• Designing schematic design
• Preparing detail drawings

Client : Local Community in Semenyih
Type of Project : Religious Building
Location : Semenyih, Selangor
Project Cost (RM) : 200k
Completion Date : 2022
Building(s) : Praying Hall

 

5.jpg

Resort Tanamera @ Kg. Tanah Merah, Kuala Kangsar

1 (1).jpg

Client : Private Land Owner
Type of Project : Commercial
Location : Kg. Tanah Merah,                                         Kuala Kangsar
Project Cost : RM1 million
Completion Date : 2023
Building Components:

 

  • Cabin Chalet

  • Administration Building

  • Common Facilities Building

Scope of Works:

  •  Preparing Schematic Design

  •  Preparing Detail Drawings

  •  Preparing Initial Costing Documents

Tuna Canned Factory@Pelabuhan Tok Bali, Kelantan

Client  : Konsortium Ukhwah

Type of Project  : Industrial

Location  : Pelabuhan Tok Bali, Kelantan

Project Cost (RM)  : 25 Million

Completion Date  : 2024

Building(s)  :

 

  • Tuna Processing Factory

  • Office Gallery

  • Musolla & Canteen

  • Staff Transit 

  • Cold Storage

 

Scope of Works  :

  • Designing Schematic Design

  • Preparing Detail Drawings

  • Tender Drawings (Soon)

  • Site Monitoring (Soon)

8.jpg

Minaret for Masjid Kariah Gadong Jaya @ Labu, Negeri Sembilan

1 (5).jpg

Scope of Works :


• Designing schematic design
• Preparing detail drawings 
• Getting JAINS approval
• Supervising on site

Client  : Masjid Kariah Gadong Jaya
Type of Project  : Institution
Location  : Labu, Negeri Sembilan

Project Cost (RM)  : 150k

Completion Date  : 2022

Building(s)  :

  • Minaret

Staff Quarters @ Maahad Tahfiz Al-Habibiyyah, Kuang, Selangor

Scope of Works :
• Designing schematic design
• Preparing detail drawings

Client : Maahad Tahfiz Al-Quran Al-Habibiyyah
Type of Project : Residential Building
Location : Kuang, Selangor
Project Cost (RM) : 200k
Completion Date : 2022
Building(s) :

 

3 Units Staff Quarters

 

Enscape_2022-06-09-15-09-29.jpg
bottom of page